Installation of bus duct connectors

1. According to the final design direction of the bus duct, confirm whether there are any changes to the obstacles and reserved positions on its direction.

2. Undertake the fabrication and installation of brackets at the bus duct installation site;

3. Conduct insulation testing before installation;

4. Hoisting bus ducts and inter-segment connections;

5. Correct, adjust and inspect the previous installation.

6. Connect the bus duct to the power distribution equipment (switch cabinets, transformers, etc.);


7. Plug-in boxes and other devices;


8. Conduct electrical testing on the bus duct system.

Recommend

Contact with us Get Free Samples

We will contact you as soon as we see your information!

address
Address:
No. 168 Sanfeng North Road, Yangzhong City, Zhenjiang City, Jiangsu Province
phone
WhatsAp:
+86-15831229909
email
E-mail:
1262051990@qq.com